
St George Mining Ltd (ASX:SGQ, FRA:S0G, OTC:SGQMF) has delivered its thickest and most compelling drill result yet from the Araxá Rare Earths and Niobium Project in Brazil, with a standout intercept of 178.7 metres at 4.34% total rare earth oxides (TREO) and 0.75% niobium oxide (Nb₂O₅) from surface.
The result — the thickest mineralised interval recorded at Araxá to date — underscores the scale, grade and near-surface continuity of the deposit, reinforcing its status as one of the most significant undeveloped rare earths and niobium projects globally.
It forms part of a broader batch of assay results from 15 diamond drill holes, with multiple wide, high-grade intercepts continuing to demonstrate consistency across the system.
Oblique section showing the latest diamond drill holes as well as other significant drilling completed in the current campaign. The latest drill holes with red labels.
Among the highlights:
-
165.3m at 4.28% TREO and 0.61% Nb₂O₅ from surface
-
150.2m at 4.64% TREO and 0.59% Nb₂O₅ from surface
-
163.65m at 3.29% TREO and 0.45% Nb₂O₅ from surface
-
81.05m at 5.14% TREO and 0.64% Nb₂O₅ from surface
These results continue to highlight a defining feature of Araxá — very thick, high-grade mineralisation starting at surface, supporting the potential for a low-strip, open-pit mining operation.
Section A – A’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline.
Executive chairman John Prineas said the combination of scale and grade, particularly from surface, sets Araxá apart from comparable projects.
“The drilling results continue to show huge true widths from surface paired with very high grades,” he said.
“This unique combination is unrivalled among emerging rare earths and niobium developers,” he added. “The commercial advantage of high-grade mineralisation starting from surface — as opposed to 50 metres or even more than 100 metres below surface — cannot be underestimated.”
Section B – B’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline, showing the expansion of the existing MRE.
High-grade system continues to expand
Drilling at Araxá has now been running continuously for more than six months, with the current program designed to both expand and upgrade the mineral resource estimate.
The latest results demonstrate strong grade continuity over broad intervals and suggest further upside, with the mineral system remaining open in all directions and at depth.
最近の投稿
- 1
From Fledgling to Master: Self-awareness in a Side interest - 2
ByHeart sued over recalled formula by parents of infants sickened with botulism - 3
Vehicle Lovers' Decision: Purchase A Reasonable Vehicle - 4
Astrophotographer captures spectacular photo of Antennae Galaxies dueling in deep space - 5
10 Natural products to Remember for Your Eating routine for a Better You
Doritos and Cheetos dial back the bright orange in new versions without artificial ingredients
Nick Reiner's defense attorney asks to be replaced, again delaying arraignment in connection with the stabbing deaths of his parents, Rob Reiner and Michele Singer Reiner
Several injured as man threatens attack on German high-speed train
An Extended time of Self-Reflection: Self-awareness through Journaling
Does physics say that free will doesn't exist?
4 Home Rec center Hardware Decisions for Little Spaces
True to life Authenticity d: A Survey of \Certifiable Stories\ Narrative
Pick Your #1 Japanese Food
Step by step instructions to Pick the Right Sunlight powered charger Type for Your Home











